Manufacture of water fountains and irrigation

English (United Kingdom)Español (spanish formal Internacional)French (Fr)

ABS Junction Boxes of 2"

The stub-ups must be install into the concrete of the base of the water fountain and make the connection at the base of the stub-up with 2” F pipeline leading to the general control pannel.

  • Junction Boxes of 2
  • Junction Boxes of 2
  • Junction Boxes of 2
  • Junction Boxes of 2
  • Junction Boxes of 2
  • Junction Boxes of 2

Download the data sheet in .PDF format
You are here: Home Catalogue Electricity ABS Junction Boxes of 2"